Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the colibri-page-builder domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/adyard/wp-includes/functions.php on line 6131
Completed Projects - Altrad Adyard AbuDhabi LLC
Notice: Function WP_Styles::add was called incorrectly. The style with the handle "wpcf7-redirect-script-frontend" was enqueued with dependencies that are not registered: contact-form-7. Please see Debugging in WordPress for more information. (This message was added in version 6.9.1.) in /nas/content/live/adyard/wp-includes/functions.php on line 6131

Notice: Function WP_Scripts::add was called incorrectly. The script with the handle "wpcf7-redirect-script" was enqueued with dependencies that are not registered: contact-form-7. Please see Debugging in WordPress for more information. (This message was added in version 6.9.1.) in /nas/content/live/adyard/wp-includes/functions.php on line 6131

Altrad Adyard Abu Dhabi
A few Completed Key Projects

3rd Instrument Air Compressor Package at Buhasa

Client : ADNOC Gas Processing

Completion : 2018 – 2020



Scope of Work:

  Detail Engineering Works

   Construction of New Road

   Construction of Civil Foundations

   Piping & Structural Fabrication works

   Installation of Air Compressor Packages

   Installation of Refrigeration Packages

   Installation of Air Dryer Packages

   Installation of Lighting Poles & Fixtures

   Insulation & Cladding works

   Modification of Existing DCS/IPS &
    FGS – OEM HONEYWELL

   Modification of Existing Condition
     Monitoring System – OEM BHGE

   Associated Piping and E&I Works

Air Receiver Vessel Details – 4V 103C 112A

   Size: ID-3.3m; H-14.1m

   Capacity: 122m3

   Certification: U-stamp

Electrical & Instrumentation Works

   Electrical Cables Laying: 5Km

   Instrument Cables Laying: 15Km

Piping & Instructural

   Piping: 2000 In Dia

   Structural: 10Tons


New 3rd Instrument Sieve Project at BuHasa

Client : ADNOC Gas Processing

Completion : 2018 – 2020


Scope of Work:

   Detail Engineering

   Civil works for Foundations

   Piping & Structural Fabrication works

   Installation of Vessel 3C-153C

   Installation of Vessel Platforms

   Installation of Lighting fixtures

   Modification of Existing DCS/IPS & FGS – OEM HONEYWELL

   Modification of Existing Small power distribution boards

   Piping Tie-in Works during Plant Shutdown

   Insulation & Cladding works

   Fireproofing works

   Associated Piping and E&I Works

Vessel Details – 3C 153C

   Size: ID-2.75m; H-7.3m

   Capacity: 22m3

   Certification: U-stamp

   Piping & Structural

Piping: 1500 In Dia.

   Structural: 15Tons

   Electrical & Instrumentation Works

   E&I Cable Laying: 5Km

Ruwais Replacement of Liquid Sulphur Loading
Arm & EHT System

Client : ADNOC Gas Processing

Completion : 2018 – 2020


Scope of Work:

   Detail Engineering Works

   Dismantle & Decommission the existing MLA & EHT System

   Installation of New MLA Equipment & EHT System

   Installation of ESD PLC system – OEM EMERSON

   Modification of Existing DCS System – OEM EMERSON

   Installation of Electrical Heat Tracing Cables

   Removal of Insulation and Cladding on existing pipeline 12”

   Installation of new Insulation and Cladding on existing 12” Pipeline

   Piping & Structural Fabrication Works

   Civil Works for foundation &cable trenches

   Associated Piping & E&I Works

   DP-2 Vessel for Transporting the MLA & EHT Equipment

   Rescue Boat for the entire construction duration

Electrical & Instrumentation Works

   Electrical Cable Laying: 5 Km

   Instrument Cable Laying: 15km

   EHT Cable: 3Km

Insulation & Cladding Works

   Pipe size: 12”

   Pipe Length: 1200m




Design, Engineering, Installation & Commissioning of 3.3kV SWBD & Load Banks at Takreer Ruwais

Client : ADNOC Refining

Completion : 2018 – 2019

Enhancement of ESD System at Takreer Abu Dhabi Refinery-SIL-3 Recommendation

Client : ADNOC Refining

Completion : 2018 – 2019

Replacement of Plant Instrument & Air compressor at
UAD & Arzanah Island

Client : ADNOC Offshore

Completion : 2018 -2019


Scope of Work:

Design, Engineering, Construction, Testing and Commissioning for UAD & Arzanah

     Instrument Air Compressor Package

           Offshore lifting

           Installation of 4Nos of compressor package

           2 nos. Dryer

           Installation of VSD panel

           Installation of TMR PLC system and related graphic modification on existing DCS &

     Hook up and changeover the new package without shutdown

Replacement of 415V Emergency Switchgear at
Umm Al Dalkh Platform

Client : ADNOC Offshore

Completion : 2017 – 2018


Scope of Work:

      PLC Based Switchgear Design

      Engineering, Construction (Online Replacement)

      Testing & Commission


Compressor Package at BuHasa

Client : ADNOC Gas Processing

Completion : 2017 – 2019


Scope of Work:

     Detail Engineering Works

     Construction of New Road

     Construction of Civil Foundations

     Piping & Structural Fabrication works

     Installation of Air Compressor Packages

     Installation of Refrigeration Packages

     Installation of Air Dryer Packages

     Installation of Lighting Poles & Fixtures

     Insulation & Cladding works

     Modification of Existing DCS/IPS & FGS – OEM HONEYWELL

     Modification of Existing Condition Monitoring System – OEM BHGE

     Associated Piping and E&I Works


Replacement of Instrument Air Distribution Network

Client : ADNOC Offshore

Completion : 2015 – 2017


Scope of Work:

      Design, engineering, construction, testing and commissioning for ‘ZWSC’ instrument air header and instrument air tubing

      Fabrication/replacement on a live plant with brown field work permits

      –1 Inch Piping Network – 2.5Km

             Pressure switches – 27 No.

             PT’s – 37 No.

             Instrument Tubing – 12Km

             Manifold – 175 No



Qatar Gas 3&4 Offshore Facilities Project, Platform 7&9 Wellbay Hookup Construction & Installation

Client : ADNOC Offshore

Completion : 2015 – 2017


Scope of Work:

      Well Heads Platform 7 & 9 Wellbay Hookup Of Inconel 625

      22 Well Flow Line And D’ Annulus System Hook Up

      Wireless Transmitters DCS/RTU Integration

      Wellhead Panel Testing and Commissioning

Upgrade Berth 1 Facilities and Extend
Berths 2&3 Firefighting System

Client : ADNOC Gas Processing

Completion : 2015 – 2017

Scope of Work:

–           Engineering, Procurement and Construction

–           Replacement of existing manual access gangway

–           Modification and upgrade of power requirements to upgraded equipment in the existing jetty substation

–           Replacement of existing Metocean and weather monitoring system


Maximum Production

Client : ADNOC Sour Gas

Completion : 2015 – 2016


Scope of Work:

The Maximum production project has the objective to increase the Shah Gas Plant capacity to 130% of the original design capacity. The increase shall be achieved through a serious of debottlenecked upgrades to be implemented during the 2018 Shutdown. Upgradation implemented in different Units;

       Unit 0721 / 0722 (Red Zone Area)

       Unit 0751 / 0752 / 0753 / 0754 (Amber Zone Areas)

       UNIT 0741 Yellow Zone

       UNIT 0742 Green Zone Areas

 


3rd IA Compressor Package

Client : ADNOC Gas Processing

Completion : 2014 – 2016



Scope of Work:

–     Site survey, data collection and Verification

–     Detail Engineering and Construction Engineering in collaboration with AMEC FW

   –3 D Modelling using software Plant 3d

   –Piping Stress analysis

–     Procurement of E&I Equipment, skid packages

   –Compressor

   –Control Panels

   –Switch gear

–     Skid Packages

–     Construction work in the live plant under strict PTW regulations

–     Commissioning and testing activities


UAD Facilities Installation of ESP

Client : ADNOC Gas Processing

Completion : 2010 – 2013


Scope of Work:

§Detailed Engineering

§Electrical Cable : 32 KM, Transformers : 9 Nos, 3.3 KV SWBD – 4 Nos, LV SWBD – 6 Nos, MV SWBD – 2 Nos, Field Instruments : 750 Nos, Instrument Cable : 67 KM, ESD, IPCS, F &G & DCS Panels – 3 Nos, Deck Extension – 2 Nos

§Procurement of critical items including the following:

Electrical cable installation: 32 KM

Supply and installation of transformers: 9 Nos

Procurement and installation of 3.3 KV SWBD: 4 Nos

Installation of LV SWBD : 6 Nos

MV SWBD: 2 Nos

Field instruments: 750 Nos

Instrument cable: 67 KM

ESD, IPCS, F&G and DCS Panels: 3 Nos

Deck extension: 2 Nos

§Construction activities in the yard as well as offshore installations


BUHASA Facilities Upgrading (HUP) Project

Client : ADNOC Gas Processing

Completion : 2010 – 2013

Scope of Work:

§Construction works at Bu-Hasa Train 1 Upgrade

§Foundation for equipment and piping sleepers

§Structural Fabrication and installation

§Piping Installation works (CS/SS)

§Electrical cable/cable trays installation works (over 10 KM)

§Major static equipment’s installation/Critical Rigging (18 Nos)

§Inspection and testing – NDT

§Sandblasting/Painting.

§Hydrotesting of piping per codes