Altrad Adyard Abu Dhabi
A few Completed Key Projects

3rd Instrument Air Compressor Package at Buhasa

Client : ADNOC Gas Processing

Completion : 2018 – 2020



Scope of Work:

  Detail Engineering Works

   Construction of New Road

   Construction of Civil Foundations

   Piping & Structural Fabrication works

   Installation of Air Compressor Packages

   Installation of Refrigeration Packages

   Installation of Air Dryer Packages

   Installation of Lighting Poles & Fixtures

   Insulation & Cladding works

   Modification of Existing DCS/IPS &
    FGS – OEM HONEYWELL

   Modification of Existing Condition
     Monitoring System – OEM BHGE

   Associated Piping and E&I Works

Air Receiver Vessel Details – 4V 103C 112A

   Size: ID-3.3m; H-14.1m

   Capacity: 122m3

   Certification: U-stamp

Electrical & Instrumentation Works

   Electrical Cables Laying: 5Km

   Instrument Cables Laying: 15Km

Piping & Instructural

   Piping: 2000 In Dia

   Structural: 10Tons


New 3rd Instrument Sieve Project at BuHasa

Client : ADNOC Gas Processing

Completion : 2018 – 2020


Scope of Work:

   Detail Engineering

   Civil works for Foundations

   Piping & Structural Fabrication works

   Installation of Vessel 3C-153C

   Installation of Vessel Platforms

   Installation of Lighting fixtures

   Modification of Existing DCS/IPS & FGS – OEM HONEYWELL

   Modification of Existing Small power distribution boards

   Piping Tie-in Works during Plant Shutdown

   Insulation & Cladding works

   Fireproofing works

   Associated Piping and E&I Works

Vessel Details – 3C 153C

   Size: ID-2.75m; H-7.3m

   Capacity: 22m3

   Certification: U-stamp

   Piping & Structural

Piping: 1500 In Dia.

   Structural: 15Tons

   Electrical & Instrumentation Works

   E&I Cable Laying: 5Km

Ruwais Replacement of Liquid Sulphur Loading
Arm & EHT System

Client : ADNOC Gas Processing

Completion : 2018 – 2020


Scope of Work:

   Detail Engineering Works

   Dismantle & Decommission the existing MLA & EHT System

   Installation of New MLA Equipment & EHT System

   Installation of ESD PLC system – OEM EMERSON

   Modification of Existing DCS System – OEM EMERSON

   Installation of Electrical Heat Tracing Cables

   Removal of Insulation and Cladding on existing pipeline 12”

   Installation of new Insulation and Cladding on existing 12” Pipeline

   Piping & Structural Fabrication Works

   Civil Works for foundation &cable trenches

   Associated Piping & E&I Works

   DP-2 Vessel for Transporting the MLA & EHT Equipment

   Rescue Boat for the entire construction duration

Electrical & Instrumentation Works

   Electrical Cable Laying: 5 Km

   Instrument Cable Laying: 15km

   EHT Cable: 3Km

Insulation & Cladding Works

   Pipe size: 12”

   Pipe Length: 1200m




Design, Engineering, Installation & Commissioning of 3.3kV SWBD & Load Banks at Takreer Ruwais

Client : ADNOC Refining

Completion : 2018 – 2019

Enhancement of ESD System at Takreer Abu Dhabi Refinery-SIL-3 Recommendation

Client : ADNOC Refining

Completion : 2018 – 2019

Replacement of Plant Instrument & Air compressor at
UAD & Arzanah Island

Client : ADNOC Offshore

Completion : 2018 -2019


Scope of Work:

Design, Engineering, Construction, Testing and Commissioning for UAD & Arzanah

     Instrument Air Compressor Package

           Offshore lifting

           Installation of 4Nos of compressor package

           2 nos. Dryer

           Installation of VSD panel

           Installation of TMR PLC system and related graphic modification on existing DCS &

     Hook up and changeover the new package without shutdown

Replacement of 415V Emergency Switchgear at
Umm Al Dalkh Platform

Client : ADNOC Offshore

Completion : 2017 – 2018


Scope of Work:

      PLC Based Switchgear Design

      Engineering, Construction (Online Replacement)

      Testing & Commission


Compressor Package at BuHasa

Client : ADNOC Gas Processing

Completion : 2017 – 2019


Scope of Work:

     Detail Engineering Works

     Construction of New Road

     Construction of Civil Foundations

     Piping & Structural Fabrication works

     Installation of Air Compressor Packages

     Installation of Refrigeration Packages

     Installation of Air Dryer Packages

     Installation of Lighting Poles & Fixtures

     Insulation & Cladding works

     Modification of Existing DCS/IPS & FGS – OEM HONEYWELL

     Modification of Existing Condition Monitoring System – OEM BHGE

     Associated Piping and E&I Works


Replacement of Instrument Air Distribution Network

Client : ADNOC Offshore

Completion : 2015 – 2017


Scope of Work:

      Design, engineering, construction, testing and commissioning for ‘ZWSC’ instrument air header and instrument air tubing

      Fabrication/replacement on a live plant with brown field work permits

      –1 Inch Piping Network – 2.5Km

             Pressure switches – 27 No.

             PT’s – 37 No.

             Instrument Tubing – 12Km

             Manifold – 175 No



Qatar Gas 3&4 Offshore Facilities Project, Platform 7&9 Wellbay Hookup Construction & Installation

Client : ADNOC Offshore

Completion : 2015 – 2017


Scope of Work:

      Well Heads Platform 7 & 9 Wellbay Hookup Of Inconel 625

      22 Well Flow Line And D’ Annulus System Hook Up

      Wireless Transmitters DCS/RTU Integration

      Wellhead Panel Testing and Commissioning

Upgrade Berth 1 Facilities and Extend
Berths 2&3 Firefighting System

Client : ADNOC Gas Processing

Completion : 2015 – 2017

Scope of Work:

–           Engineering, Procurement and Construction

–           Replacement of existing manual access gangway

–           Modification and upgrade of power requirements to upgraded equipment in the existing jetty substation

–           Replacement of existing Metocean and weather monitoring system


Maximum Production

Client : ADNOC Sour Gas

Completion : 2015 – 2016


Scope of Work:

The Maximum production project has the objective to increase the Shah Gas Plant capacity to 130% of the original design capacity. The increase shall be achieved through a serious of debottlenecked upgrades to be implemented during the 2018 Shutdown. Upgradation implemented in different Units;

       Unit 0721 / 0722 (Red Zone Area)

       Unit 0751 / 0752 / 0753 / 0754 (Amber Zone Areas)

       UNIT 0741 Yellow Zone

       UNIT 0742 Green Zone Areas

 


3rd IA Compressor Package

Client : ADNOC Gas Processing

Completion : 2014 – 2016



Scope of Work:

–     Site survey, data collection and Verification

–     Detail Engineering and Construction Engineering in collaboration with AMEC FW

   –3 D Modelling using software Plant 3d

   –Piping Stress analysis

–     Procurement of E&I Equipment, skid packages

   –Compressor

   –Control Panels

   –Switch gear

–     Skid Packages

–     Construction work in the live plant under strict PTW regulations

–     Commissioning and testing activities


UAD Facilities Installation of ESP

Client : ADNOC Gas Processing

Completion : 2010 – 2013


Scope of Work:

§Detailed Engineering

§Electrical Cable : 32 KM, Transformers : 9 Nos, 3.3 KV SWBD – 4 Nos, LV SWBD – 6 Nos, MV SWBD – 2 Nos, Field Instruments : 750 Nos, Instrument Cable : 67 KM, ESD, IPCS, F &G & DCS Panels – 3 Nos, Deck Extension – 2 Nos

§Procurement of critical items including the following:

Electrical cable installation: 32 KM

Supply and installation of transformers: 9 Nos

Procurement and installation of 3.3 KV SWBD: 4 Nos

Installation of LV SWBD : 6 Nos

MV SWBD: 2 Nos

Field instruments: 750 Nos

Instrument cable: 67 KM

ESD, IPCS, F&G and DCS Panels: 3 Nos

Deck extension: 2 Nos

§Construction activities in the yard as well as offshore installations


BUHASA Facilities Upgrading (HUP) Project

Client : ADNOC Gas Processing

Completion : 2010 – 2013

Scope of Work:

§Construction works at Bu-Hasa Train 1 Upgrade

§Foundation for equipment and piping sleepers

§Structural Fabrication and installation

§Piping Installation works (CS/SS)

§Electrical cable/cable trays installation works (over 10 KM)

§Major static equipment’s installation/Critical Rigging (18 Nos)

§Inspection and testing – NDT

§Sandblasting/Painting.

§Hydrotesting of piping per codes