Altrad Adyard Abu Dhabi
A few Completed Key Projects
3rd Instrument Air Compressor Package at Buhasa
Client : ADNOC Gas Processing
Completion : 2018 – 2020





Scope of Work:
Detail Engineering Works
Construction of New Road
Construction of Civil Foundations
Piping & Structural Fabrication works
Installation of Air Compressor Packages
Installation of Refrigeration Packages
Installation of Air Dryer Packages
Installation of Lighting Poles & Fixtures
Insulation & Cladding works
Modification of Existing DCS/IPS &
FGS – OEM HONEYWELL
Modification of Existing Condition
Monitoring System – OEM BHGE
Associated Piping and E&I Works
Air Receiver Vessel Details – 4V 103C 112A
Size: ID-3.3m; H-14.1m
Capacity: 122m3
Certification: U-stamp
Electrical & Instrumentation Works
Electrical Cables Laying: 5Km
Instrument Cables Laying: 15Km
Piping & Instructural
Piping: 2000 In Dia
Structural: 10Tons
New 3rd Instrument Sieve Project at BuHasa
Client : ADNOC Gas Processing
Completion : 2018 – 2020
Scope of Work:
Detail Engineering
Civil works for Foundations
Piping & Structural Fabrication works
Installation of Vessel 3C-153C
Installation of Vessel Platforms
Installation of Lighting fixtures
Modification of Existing DCS/IPS & FGS – OEM HONEYWELL
Modification of Existing Small power distribution boards
Piping Tie-in Works during Plant Shutdown
Insulation & Cladding works
Fireproofing works
Associated Piping and E&I Works
Vessel Details – 3C 153C
Size: ID-2.75m; H-7.3m
Capacity: 22m3
Certification: U-stamp
Piping & Structural
Piping: 1500 In Dia.
Structural: 15Tons
Electrical & Instrumentation Works
E&I Cable Laying: 5Km





Ruwais Replacement of Liquid Sulphur Loading
Arm & EHT System
Client : ADNOC Gas Processing
Completion : 2018 – 2020




Scope of Work:
Detail Engineering Works
Dismantle & Decommission the existing MLA & EHT System
Installation of New MLA Equipment & EHT System
Installation of ESD PLC system – OEM EMERSON
Modification of Existing DCS System – OEM EMERSON
Installation of Electrical Heat Tracing Cables
Removal of Insulation and Cladding on existing pipeline 12”
Installation of new Insulation and Cladding on existing 12” Pipeline
Piping & Structural Fabrication Works
Civil Works for foundation &cable trenches
Associated Piping & E&I Works
DP-2 Vessel for Transporting the MLA & EHT Equipment
Rescue Boat for the entire construction duration
Electrical & Instrumentation Works
Electrical Cable Laying: 5 Km
Instrument Cable Laying: 15km
EHT Cable: 3Km
Insulation & Cladding Works
Pipe size: 12”
Pipe Length: 1200m
Design, Engineering, Installation & Commissioning of 3.3kV SWBD & Load Banks at Takreer Ruwais
Client : ADNOC Refining
Completion : 2018 – 2019




Enhancement of ESD System at Takreer Abu Dhabi Refinery-SIL-3 Recommendation
Client : ADNOC Refining
Completion : 2018 – 2019


Replacement of Plant Instrument & Air compressor at
UAD & Arzanah Island
Client : ADNOC Offshore
Completion : 2018 -2019
Scope of Work:
Design, Engineering, Construction, Testing and Commissioning for UAD & Arzanah
Instrument Air Compressor Package
– Offshore lifting
– Installation of 4Nos of compressor package
– 2 nos. Dryer
– Installation of VSD panel
– Installation of TMR PLC system and related graphic modification on existing DCS &
Hook up and changeover the new package without shutdown

Replacement of 415V Emergency Switchgear at
Umm Al Dalkh Platform
Client : ADNOC Offshore
Completion : 2017 – 2018

Scope of Work:
PLC Based Switchgear Design
Engineering, Construction (Online Replacement)
Testing & Commission
Compressor Package at BuHasa
Client : ADNOC Gas Processing
Completion : 2017 – 2019
Scope of Work:
Detail Engineering Works
Construction of New Road
Construction of Civil Foundations
Piping & Structural Fabrication works
Installation of Air Compressor Packages
Installation of Refrigeration Packages
Installation of Air Dryer Packages
Installation of Lighting Poles & Fixtures
Insulation & Cladding works
Modification of Existing DCS/IPS & FGS – OEM HONEYWELL
Modification of Existing Condition Monitoring System – OEM BHGE
Associated Piping and E&I Works

Replacement of Instrument Air Distribution Network
Client : ADNOC Offshore
Completion : 2015 – 2017

Scope of Work:
Design, engineering, construction, testing and commissioning for ‘ZWSC’ instrument air header and instrument air tubing
Fabrication/replacement on a live plant with brown field work permits
–1 Inch Piping Network – 2.5Km
– Pressure switches – 27 No.
– PT’s – 37 No.
– Instrument Tubing – 12Km
– Manifold – 175 No
Qatar Gas 3&4 Offshore Facilities Project, Platform 7&9 Wellbay Hookup Construction & Installation
Client : ADNOC Offshore
Completion : 2015 – 2017



Scope of Work:
Well Heads Platform 7 & 9 Wellbay Hookup Of Inconel 625
22 Well Flow Line And D’ Annulus System Hook Up
Wireless Transmitters DCS/RTU Integration
Wellhead Panel Testing and Commissioning
Upgrade Berth 1 Facilities and Extend
Berths 2&3 Firefighting System
Client : ADNOC Gas Processing
Completion : 2015 – 2017
Scope of Work:
– Engineering, Procurement and Construction
– Replacement of existing manual access gangway
– Modification and upgrade of power requirements to upgraded equipment in the existing jetty substation
– Replacement of existing Metocean and weather monitoring system





Maximum Production
Client : ADNOC Sour Gas
Completion : 2015 – 2016
Scope of Work:
The Maximum production project has the objective to increase the Shah Gas Plant capacity to 130% of the original design capacity. The increase shall be achieved through a serious of debottlenecked upgrades to be implemented during the 2018 Shutdown. Upgradation implemented in different Units;
– Unit 0721 / 0722 (Red Zone Area)
– Unit 0751 / 0752 / 0753 / 0754 (Amber Zone Areas)
– UNIT 0741 Yellow Zone
– UNIT 0742 Green Zone Areas

3rd IA Compressor Package
Client : ADNOC Gas Processing
Completion : 2014 – 2016

Scope of Work:
– Site survey, data collection and Verification
– Detail Engineering and Construction Engineering in collaboration with AMEC FW
–3 D Modelling using software Plant 3d
–Piping Stress analysis
– Procurement of E&I Equipment, skid packages
–Compressor
–Control Panels
–Switch gear
– Skid Packages
– Construction work in the live plant under strict PTW regulations
– Commissioning and testing activities
UAD Facilities Installation of ESP
Client : ADNOC Gas Processing
Completion : 2010 – 2013
Scope of Work:
§Detailed Engineering
§Electrical Cable : 32 KM, Transformers : 9 Nos, 3.3 KV SWBD – 4 Nos, LV SWBD – 6 Nos, MV SWBD – 2 Nos, Field Instruments : 750 Nos, Instrument Cable : 67 KM, ESD, IPCS, F &G & DCS Panels – 3 Nos, Deck Extension – 2 Nos
§Procurement of critical items including the following:
–Electrical cable installation: 32 KM
–Supply and installation of transformers: 9 Nos
–Procurement and installation of 3.3 KV SWBD: 4 Nos
–Installation of LV SWBD : 6 Nos
–MV SWBD: 2 Nos
–Field instruments: 750 Nos
–Instrument cable: 67 KM
–ESD, IPCS, F&G and DCS Panels: 3 Nos
–Deck extension: 2 Nos
§Construction activities in the yard as well as offshore installations



BUHASA Facilities Upgrading (HUP) Project
Client : ADNOC Gas Processing
Completion : 2010 – 2013

Scope of Work:
§Construction works at Bu-Hasa Train 1 Upgrade
§Foundation for equipment and piping sleepers
§Structural Fabrication and installation
§Piping Installation works (CS/SS)
§Electrical cable/cable trays installation works (over 10 KM)
§Major static equipment’s installation/Critical Rigging (18 Nos)
§Inspection and testing – NDT
§Sandblasting/Painting.
§Hydrotesting of piping per codes