Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the colibri-page-builder domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /nas/content/live/adyard/wp-includes/functions.php on line 6131
Modules & Fabrication - Altrad Adyard AbuDhabi LLC
Notice: Function WP_Styles::add was called incorrectly. The style with the handle "wpcf7-redirect-script-frontend" was enqueued with dependencies that are not registered: contact-form-7. Please see Debugging in WordPress for more information. (This message was added in version 6.9.1.) in /nas/content/live/adyard/wp-includes/functions.php on line 6131

Notice: Function WP_Scripts::add was called incorrectly. The script with the handle "wpcf7-redirect-script" was enqueued with dependencies that are not registered: contact-form-7. Please see Debugging in WordPress for more information. (This message was added in version 6.9.1.) in /nas/content/live/adyard/wp-includes/functions.php on line 6131

Modules & Fabrication
A Few of the Altrad Adyad Key Project



Supply of 4 No’s Ultrafiltration and
3 No’s Nano filtration Skid Packages

Client: Schlumberger
End User: 
ADNOC Offshore (SRP 3 Project)
Completion: 
2017 – 2018


Scope of Work:

Preparation of shop drawings, supply, fabrication, CS/SS/SDSS/GRE piping, Installation of Client FIM equipment, E &I Works, Inspection & Trail assembly of Ultra filtration & Nano filtration.

100% Check test on the primary and secondary material, stringent approval vendor list.

Handling of exotic SS & SDSS piping & Titanium grade Nano-filtration membranes.

FIM Valve testing and E & I works meeting Client stringent specification.

Installation of all the Client Free issue vessels, valves and Instruments.

Trial Assembly of all the 7 skids and loading on to the Client transport

Satah Al Razboot (Sarb) Plant

Client : Hyundai Engineering and Construction

Completion : 2015 – 2017

Scope of Work:

§  Fabrication Engineering

§  Structural Material Procurement

§  Module Fabrication x12

§  Fabrication of structural steel

§  Piping Fabrication

§  Equipment installation with pipes line and Assembly of Modules

§  Testing

§  Painting

§  Fire proofing

§  Installation and ex-works supply of modules

             DETAILS OF ITEMS

Dimension(L x B x H)                57 x 32 x 19

Total Weight of Modules        14,500 MT

No of Modules                           12 NO’s



East Hub FPSO Module Fabrication

Client : Veolia

Completion : 2015 – 2016


Scope of Work:

§  Procurement of structures

§  Fabrication & Assembly

§  Painting

§  Equipment installation

§  Non-Destructive Testing and Testing of skids 

§  Detailed Engineering

§  Hydro-Testing

 


EGINA

Client : Veolia

Completion : 2015 – 2016

EGINA


Scope of Work:

§  Procurement of structures

§  Fabrication

§  Assembly

§  Painting

§  Equipment installation

§  Non-Destructive Testing and Testing of skids 

§  Detailed Engineering

§  Hydro-Testing

C-26 Cluster and B173A-B Well Platform Project

Client : ESSAR Offshore Subsea Ltd / ONGC

Completion : 2013 – 2016


Scope of Work:

§  Shop Fabrication drawings.

§  Jackets – Fabrication and its appurtenances,

§  Installation of Anodes, erection of gratings, handrails, walkway, ladders etc. Installation of rub strips, blasting, painting and markings.

§  Piles and Conductors – Fabrication, blasting and TSA coating, on land transportation and load out on barge.

§  Decks – Fabrication of Structures, Piping, Mechanical and Architecture components. Weighing of decks, on land transportation and load out on barge.

§  Bridge – Fabrication, installation of gratings, piping, cable trays, monorails etc. Hydro testing and air leak testing.

§  Testing – NDT

§  Load-out on barge and sea fastening


ADMA-OPCO NASR Phase-I & UMM LULU

Client : L&T Hydrocarbon Upstream

Completion : 2012 – 2014

Scope of Work:

§  Subcontract for Fabrication and Offshore Hook-Up Construction Works

§  Performed Fabrication, E&I scope.

§  Onshore fabrication and offshore construction / hook-up of Structural deck extensions, Piping, Electrical, Instrumentation, Telecommunication Systems

§  Components of US-12A and USSC existing platforms and WHP-02, WHP-11 and CPC at Umm Al Dalakh Field