Altrad Adyard Abu Dhabi
 A Few Ongoing Key Projects

BuHaseer ESP Surface Facilities

Client : ADNOC L&S

Completion : January 2023 – ongoing


Scope of Work:

Engineering, Procurement, Construction, and Commissioning of Package-4 Facilities including Project Management, HSE, Quality, Site Surveys, Detailed Engineering, Procurement, Supply, Fabrication, Transportation, Demolition, Modification, Installation, Testing & Commissioning Works

The following are the main ESP surface / topside equipment:

–           Variable Frequency Drive for the ESPs

           ESP Distribution Transformers

–           VFD Step up Transformers (as applicable for LV VFD Design)

–           Switchgear Room to house VFD’s, LV Switchgears, Surface Cabinets, EID Cabinet, UPS Sub DBs, Lighting & Small Power DBs etc.

–           Field Mounted Junction Boxes and interconnecting Cabling

–           Supporting Facilities such as HVAC System, F&G, Clean Agent System, Architectural furnishings, Building other Safety equipment etc.

–           Open Drain and Closed Drain Piping Network (to be hooked-up with respective existing piping system of WHT BH1 & BH2)


Ongoing Key Project

EPC for Glycol Flare upgrade

Client : ADNOC Gas Processing
Completion : 
December 2022 – ongoing 


Scope of Work:

Multi-discipline detailed design and engineering, procurement, supply of equipment and material, fabrication, inspection and testing, transportation to site, installation, construction, demolition, pre-commissioning and commissioning, test run, management and support services to Upgrade Glycol Flare Systems. Scope includes supply and installation of the following new facilities and demolition of the existing facilities.

  • Glycol Flare; 8” Flare riser, 4” Flare tip dia with 2 Pilots, 22m overall height
  • New Flare tip of same dimensions as existing and identical design, including velocity seal and flame retention ring / tabs
  • Replacement of existing pilots with new upgraded pilot
  • Replacement of existing wind shield with new Wind shield
  • Instrument from Flare to LCP
  • Local Control Panel (LCP) – Ignition skid
  • Existing Control System modification: Interfacing with DCS from LCP
  • Power Supply
  • Civil Works


Ongoing Key Project

EPC works for RSF (Rim Seal Fire) and FSF (Full Surface Fire)
Fighting System Upgrade for COS Tanks at Zirku

Client : ADNOC Offshore
Completion :
October 2022 – ongoing

Scope of Work:

Phase 1: Include Rim Seal Protections for COS Tanks 1 to 6

New Riser pipes installation
Foam Skids Modifications
Installation of Pipe supports and Sleepers
Demolition of existing risers

Phase 2: Include FSF Protection design for Tanks 1 to 6.

New Riser pipes installation
Bund Fire Protection
Installation of Piping Network
Demolition of Bund fire protection piping


Ongoing Key Project

Combined Mechanical Schemes-8 – Engg 15 Packages

Client : ADNOC Offshore
Completion :
October 2022 – ongoing 


Scope of Work:

ZR-S-1849: Replace 2″ Drain nozzles for CFU vessel no.466-V-002A.

ZR-S-1723: Procedure to deal with flame on DDT vent at Zirku Island.

ZR-S-1886: Replace 1/2″” Flushing Water Supply Lines To Produced Water Disposal Pump 427-p-101/201/301/401 With Large Bore Pipes And Install Y-type Strainers To Overcome Blockage.

ZR-S-1902: Unit 401: Replacement of the corroded portions of the liquid relief headers.

ZR-S-1925: Provide Remote Operated Valve (Rov) On 3” Drain Line From Vessels 410-v-004/006/007/008 For Emergency Draining.

ZR-S-1973: FREQUENT POPPING OF 466-P-301A/B AND DISCHARGE PSV 466-PSV-373/374 Unit 466.

ZR-S-2040: Replacement of Dry Gas Seal Pressure Switches with Electronic Transmitters.

ZR-S-2097: Replacement of Leaking Portion of 14″ CW Line to Satah (GRE).

ZR-S-2036: Unit-425 – Elimination of Dead leg on 425-P002-A/B/C Discharge Toward 443-V-005.

ZR-S-1348: Hydrocarbon Skimming from Glycol Drum 410-V-009 (C-0865).

ZR-S-1606: Replacement of Daily Diesel Oil Underground Storage Tank (4506-V-004B).

ZR-S-1639: Corrective measure for dead leg stagnant portion of 36” dia. Inlet header MOL surge relief valve.

ZR-S-1850: Replace 2” Drain Nozzle for emergency Flare-C No. 425-H-002C.

ZR-S-1889: Unit 411-Replacement of Flanged 10” X900# (411-XV-021) on Gas Export Pipeline to Das with Butt Welds.

ZR-S-2156: Replacement of Corroded Shim Plates of Surge Relief Vessel 444-V-001

Ongoing Key Project

Upgrading LNG Jetty to Berth 180,000m3 LNG Vessels

Client : ADNOC L&S
Completion :
August 2022 – ongoing

Scope of Work:

–           Engineering, Procurement and Construction

–           Replacement of existing manual access gangway

–           Modification and upgrade of power requirements to upgraded equipment in the existing jetty substation

–           Replacement of existing Metocean and weather monitoring system 

–           Upgrade of Ship-to-shore links


Ongoing Key Project

Replacement of Welded Valves with Flanged Valves at NGTP & GTP

Client :  ADNOC Offshore
Completion : February 2022 – ongoing

Scope of Work:

Engineering, procurement, construction and installation, pre-commissioning and commissioning for the replacement of total 43 Nos. of welded (both sides or single side) valves to flanged valves on a lump sum turnkey basis.


Ongoing Key Project

Critical Electrical Up-gradation Works at
Das Island & Zirku Island Phase I

Client : ADNOC Offshore
Completion :
September 2021 – ongoing


Scope of Work:

–           Replacement of UPS at Das Island (Package-A)

–           Replacement of Stand-Alone Emergency Generators at Das Island (Package-B)

–           Replacement of UPS at Zirku Island (Package-C)

–           Replacement of UPS at Das Island (Package-D)


Ongoing Key Project

Execution Stage for MUB Black
Start Diesel Engine Generators

Client :   ADOC Japan
Completion :
 April 2021 – ongoing

Scope of Work:

Residual Engineering, Procurement & Supply of Materials, Installation of New Facilities, Modification of Some Existing Facilities and Demolition of Few Facilities

(UAE Home Office): Supply, perform residual / shop drawing / construction engineering and pre-fabrication / assembly as applicable for construction. Upon Completion of same shall be transported to Construction Site for further installation towards its fit for propose of its intended usage

(Construction Site – Mubarraz Island): Supply, transportation, Construction of DEGs and its accompanying equipment and facilities. Protect Company existing facilities and perform as built survey to ensure the correct implementation of design and integrity for fit for purpose.

Ongoing Key Project

BuHasa Plant Flare Upgrade Project

Client : ADNOC Gas Processing

Completion : September 2020 – ongoing

Scope of Work:

Carry out detailed engineering, procurement of equipment & materials, construction, installation, testing, pre-commissioning, start-up & commissioning including as-built, project dossiers, project management, planning/controls, QA/QC, HSE, permits/passes for the construction works for the following Flare Upgrade Project:

New Lean Gas (LGS) Flares

Install New DCS Panel in Substation No. 4

Modify Main Plant Flares and Burnpits Main Flares & Burn Pits

Modify Main Plant Flares and Burnpits Main Flares & Burn Pits


Ongoing Key Project

EPC Project for Pipeline Surveillance System & Upgradation of Telecom System (SDH) & F&G System

Client : ADNOC Processing

Completion : January 2020 – Ongoing


Scope of Work:

Design, Engineering, Procurement, Construction, Pre-Commissioning and Commissioning for the Pipeline Surveillance System and Upgradation of Telecom Network (SDH) and F&G Systems.

New Fire & Gas Detectors and Systems, Clean Agent Systems and H2S Analysers

CCTV Facilities and Intrusion Detection System (IDS) for Pipeline Network – 125 stations

New Synchronized Digital Hierarchy (SDH) based Fiber Optic Backbone and Integration to Existing Communication Network

Ongoing Key Project

Replacement of Fire Water Pumps
at Jebel Dhanna

Client : ADNOC Onshore

Completion : December 2019 – ongoing

Scope of Work:

–           Jetty Pumps: Increase the jetty pumps capacity by replacing the existing with two (2) higher capacity pumps. Also, one (1) jockey pump is added.

–           Tank Farm Pumps: Replacing the currently installed fire pumps with higher capacity two (2) fire pumps to deliver the required flow. Also, two jockey pumps are added.

–           Tank Farm Monitors: Supply of three (3) new portable monitors for different locations in the tank farm.


Ongoing Key Project

EPC Work for Integrity Management of Barge type structures

Client :  ADNOC Offshore
Completion : February 2019 – ongoing

Scope of Work:

Residual, Procurement, and Construction activities for Integrity Management of Barge Type Structures (Mitigation Scope of Work –Construction)

Additional Load-Path Strengthening

Access Way Openings to Weld-off Chambers

Clash Mitigation


Ongoing Key Project

Upper Zakum – Top Side Modification for
New Gas Lift Facilities

Client : ADNOC Offshore

Completion : January 2019 – ongoing

Scope of Work:

Project Management, Detailed Engineering, Procurement, FAT, supply, Installation/construction, site modification, interface/integration, SAT, testing, pre-commissioning, commissioning and Ready for Start-up (RFSU) of the complete system and smooth handover of the following new/additional facilities to increase oil production in UZ Reservoir from four (4) existing WHPTs (PC-20, PC-75, PC-80 and PW-32)

New Facilities:
–     Gas line depressurization facility with mini vent boom, drain boot & UFM

–   Gas lift manifolds with gas lift line to the Wellhead Producers

–   Gas pig trap hook up and PSV platforms

–   Jump over gas line on PC20 and PC75

–   Additional vent and drain lines

–   Re-routing of existing Sump tank vent line to new mini vent boom

–   New Oil Manifold Chemical Injection Skid with Storage tank

–   Electrical driven Hand Barrel pump with drip pan connected to open drain and electrical socket